Goals

  • Review previous action items

  • Collect status updates from all team members

  • Outline new action items

Discussion topics

Presenter

Notes

Presenter

Notes

Previous Action Items

  • Stacey: Impressions not based on Nielsen - waiting on stuff from Scott Marden & team

  • Abe: follow up with Core Value about Looker Multi Environment - done, in progress with Core Value

  • Abe: follow up with Allison and Sarah re: Axper reporting requirements - done, Frank loaded it but it turns out that the dates were all wrong

  • Frank: provide geckoboard fields to John so they can be mapped to NetSuite instances - Done, Karen and Frank has been working on it… it has changed so it will be provided to John

Abe

  • Snowflake data sync frequency debugging for Core Value / roman's model

  • Lucien Data model questions…

  • Axper reporting requirements elicitation

  • Helped Scott Marden and Allie use Looker model. They saw the gaps in data and are going to monitor new data collection

  • RE Sales Year over Year time dimension filtering and % change analysis

  • Work with Looker Help for conditional formatting on single value viz (possible through a hack but not in the UI)

  • Looker instances Snowflake connection configuration

  • Elevator Health Log analysis; frank fixed everything in the backend and I provided reports to Stephanie, David Perl

Karen

  • Completing Process to validate snowflake sync with prod

    • Last night ran everything at 1AM; everything matched!

  • Moving data for Geckoboard to cloud (snowflake)

Stacey

  • CRM to Netsuite Integrations (Contacts, ended up not being needed)

  • Vistar Weekly Reporting from Mike with additional analysis

    • waiting to hear back from Vistar

    • rejected deals: followed up with campsite to see if a patch is working (spent spots greater than requested spots)

  • Adding Programmatic Fields in Sandbox (NetSuite)

Frank

  • Refactoring SSIS packages for Geckoboard to point to custom tables (which John will populate)

    • Temp solution while CoreValue rebuilds the entire project to come from SnowFlake

    • CoreValue has been working on it for a week; they are in the documentation stage

  • Moving all geckoboard out of Crosswalk; doesn’t leave a lot left in CAPCORPSQL01

    • Goal to shut down CAPCORPSQL01 by the end of the Summer; everything will be on the SQL Cluster

      • in the process, will clean up, enable logging features

  • Working on getting rid of DBAdmin login

  • API Project kickoff next week

  • Project Plan to Upgrade the Traffic System

    • waiting on ENG’s contributions

      • task list for how to get CAPROCAP01 move to a new server

  • Fortified Data (3rd party): performing a Complete Assessment of our database infrastructure

    • output: redesign of Traffic System

Andrea

  • RE Revamp’s tickets

  • CoreValue tickets

  • Matt Pocock included Andrea in a rogue project, nSuite-

  • Met all departments!

  • Warehouse: Vendor Reps, UPS, RFSmart Barcode Scanning,

    • Warehouse wants Material Review Board but Mike Levesque doesn’t like that

    • Pak has new thermal printer

  • NOC: sales orders, approvers, what goes where

  • Finance

  • 2 Subsidiaries, vendors, issues with how the currency was set up

  • Online Case Forms

  • AMP

  • Rules and Permissions must be brought under control

  • Recommended changes: implement Departments

Julia

 

Wally

We must take away all Admin Rights

Action items

@Abe Ahn (Unlicensed) Revisit Snowflake syncing hours to accommodate for West Coast
@Abe Ahn (Unlicensed) to verify which Looker Model Scott’s team is monitoring (Axper or Linkett) and make sure that the data is being collected (if it is Linkett MAC)
@Abe Ahn (Unlicensed) to get the NOC to use helpdesk for Elevator Health Log reports
@Stacey Driscoll to load Vistar data
@Stacey Driscoll to document requirements for programmatic fields for all Exchanges (Vistar, Campsite, Rubicon)
@Frank Sorrento (Unlicensed) to follow up with CoreValue re: Geckoboard in NetSuite; make sure they’re aware that everything will be out of NetSuite in the future
@Andrea Molinari (Unlicensed) to provide temporary Sandbox access to a CoreValue member
@Andrea Molinari (Unlicensed) to meet with Julia about MSA nSuite project
@Julia Murphy to find Documentantion on AMP for Andrea
@Julia Murphy to work with Wally to put a stop to nSuite (new product? now Sales Team? MSA?)

Decisions