Stacey

  • Was off last week (smile)

  • Cases into NetSuite Sandbox for Integration

  • Programmatic tab in NetSuite

    • Vistar Data import

    • Mapping from CRM to NetSuite

    • Issues:

      • Longitude Field keeps getting changed…

      • Activation Date doesn’t populate all venues

      • GVT calculation

  • Vistar Data → Haven’t gotten data from them in two weeks, even with reaching out

  • Campsite Reporting → Had an issue and reached out to Campsite

  • Reportal Report issues for Scott Barske → one issue fixed

Frank

  • Vistar API Integration is nearly complete. Rubicon integration development will begin next week.

  • Working on the data mapping for the Hivestack API Integration.

  • Geckoboard re-write from Snowflake is progressing well.

  • CRM to NetSuite project is blocking progress on some tasks (UAT, data validation) in the API Integration and Geckoboard projects, but there are other tasks that CoreValue can work on to keep progress moving.

  • Engineering has provided information for the Traffic system upgrade, so that project has resumed.

  • Confirmed with Mike Levesque that reporting to CEO and Board on number of physical buildings is required, and we are currently misreporting that metric on Geckoboard. Need to confirm that this is a count of Sites in NetSuite with an active Network Venue so that metric can be corrected with the Geckoboard rewrite project.